Volga-Dnepr successfully transports 50 t of gas

Logistics provider G&O Solutions chose to partner with Volga-Dnepr Airlines when it needed to transport 50 t of gas equipment for a compressor station from Kazan in Russia to Karshi, Uzbekistan.

The cargo was moved onboard two IL-76TD-90VD freighter flights and included rotor and wheelspace, piping and tanks, pumps, coolers and other supporting equipment. These are being used to increase gas production at the Shurtan compressor station in the biggest gas-condensate field in Uzbekistan.

Mr Ismailov, Manager, G&O Solutions, said: “This is the first time G&O Solutions has worked directly with Volga-Dnepr Airlines. Our shipment of outsize cargo was carried securely and in the shortest timescale and we are very pleased with our joint work. Our two companies have already agreed on future co-operation in projects in Central Asia.”
In 2014, more than 40 companies became new customers of Volga-Dnepr Airlines and contributed 13% of the airline’s air charter sales volume.

 

Adapted from press release by Cecilia Rehn

Published on 06/02/2015


Get your FREE Oilfield Technology magazine »

Get your FREE trial of Hydrocarbon Engineering magazine »

Get your FREE trial of World Pipelines magazine »


 
 

Related articles

Confidence in the Port of Antwerp

Leading petrochemical companies show confidence in the Port of Antwerp with billion-dollar investments.

InterMoor meets challenge

InterMoor meets local content challenge with groundbreaking joint venture in Nigeria.

Statoil awards contracts for services at seven coastal bases

Statoil has awarded the service contracts for seven bases for the company in Norway.

Volga-Dnepr extends its oil and gas capability to load drilling rig

Using specialised equipment, Volga-Dnepr Airlines were able to load a 24 m long oil and gas drilling rig bound for Mirny in Russia.

Recommend magazines

  Oilfield Technology