Expro case-study

Objectives

An operator of a deepwater well in the Gulf of Mexico experienced a work string failure while milling cement.

Initial thoughts were that they had jumped a box in the work string but attempts to re-stab into the pin were unsuccessful and when the work string was pulled and it was discovered that it had twisted off above the pin leaving fragments in the hole, which were eventual retrieved.

Expro were approached as the operator wanted to confirm the integrity and sealing surfaces of the wellhead/tubing spool and decided a downhole camera should be used for evaluation.


Expro Well Intervention

Expro’s ViewMax camera system was mobilised and run in the well.

Flexible solution – can operate on conventional electric line.

The camera inspection revealed two large fragments of the work string lodged in the wellhead (figure one) and as a result special clean-out BHAs and brushes were run to remove the debris.

Camera deployed for a second time to verify the outcome of the brushing operation.


Value to client

Saved valuable rig time using Expro’s ViewMax camera on electric line to inspect the wellhead.

Despite having the debris in the wellhead, using the camera to verify the debris had not moved after thorough brushing gave the operator confidence to proceed knowing it was securely lodged and would not fall down later incurring further costly operations.

Client’s confidence also factored into their decision not to pull the tubing spool to retrieve the debris, which would have added approximately US$10 million to the well completion.


Adapted from press release by Joseph Green

Published on 08/05/2015


Get your FREE Oilfield Technology magazine »

Get your FREE trial of Hydrocarbon Engineering magazine »

Get your FREE trial of World Pipelines magazine »


 
 

Related articles

Expro receives eni safety award for well testing services

The judges based their decision on Expro’s exemplary safety record, with the company accomplishing no lost time incidents during 535 000 hours worked for eni.

Expro awarded Ichthys LNG contract

Expro wins contract to supply high rate well testing package and ancillary services for the Ichthys LNG Project.

Expro awarded contract in the Middle East

Expro awarded multi-year SONAR production testing contract in the Middle East.

Expro secures subsea contract with BP in South Caspian Sea

Expro has secured a 5-year subsea contract, worth almost US$ 100 million contract with BP for the Shah Deniz Stage 2 project in the South Caspian Sea.

Recommend magazines

  Oilfield Technology