Aker Solutions wins five-year EPMA work

Aker Solutions will provide engineering, procurement and management assistance services for five years at the Statoil-operated Johan Sverdrup development in the Norwegian North Sea.

The EPMA work, valued at NOK 4.5 billion, is part of a 10-year framework accord announced in December 2013 and comes after Statoil decided to exercise an option. The assignment will last through 2019 and covers work in the development's first phase.

"Johan Sverdrup will define the oil industry in Norway and play a large part in our company's growth for years to come," said Luis Araujo, Aker Solutions' chief executive officer. "We are sparing no effort and working in close cooperation with the field's partners to ensure the development is second to none."

Aker Solutions last year delivered the front-end engineering and design work for the development's first phase, consisting of four platforms linked by bridges. The EPMA work for phase one is anticipated at its peak to involve more than 1000 employees at Aker Solutions' engineering hubs in Oslo, London and Mumbai.

The field, the largest offshore oil find in Norway in 30 years, is estimated to hold 1.8 billion to 2.9 billion boe. It's expected to produce 550 000 – 650 000 boe/d when fully developed, equal to about a quarter of current domestic output. Production is slated to start in late 2019 and is predicted to last for about half a century.

Statoil is operator for the development, which spans three licenses. Other partners include Lundin Norway, Petoro, Maersk Oil and Det norske oljeselskap.

"We're proud to expand on our close relationship with Statoil that has been built over many years of offshore development," said Per Harald Kongelf, head of Aker Solutions in Norway. "It's also gratifying to work with so many other partners, which is a testament to the importance of this project."

A key focus of the project team is to identify ways to reduce costs and improve the overall efficiency of the development.

"Finding cost-efficient and sustainable solutions is absolutely necessary and we will keep working with the license partners to do this through a systematic and ambitious improvement program," said Aker Solutions' Head of Engineering Valborg Lundegaard.


Adapted from press release by Joe Green

Published on 21/01/2015


Get your FREE Oilfield Technology magazine »

Get your FREE trial of Hydrocarbon Engineering magazine »

Get your FREE trial of World Pipelines magazine »


 
 

Related articles

Aker Solutions and Baker Hughes receive subsea alliance approvals

Aker Solutions and Baker Hughes have received the necessary regulatory approvals for their subsea production alliance.

Aker Solutions and Baker Hughes form subsea production alliance

Aker and Baker Hughes will form an alliance to develop technology for production solutions that will boost output and reduce costs for subsea fields.

Aker Solutions acquires Sandnessjøen Engineering

Aker Solutions has acquired Norwegian engineering company Sandnessjøen Engineering.

Aker Solutions awarded BP tieback contract for Ula

BP Norge has awarded Aker Solutions an engineering, procurement, construction and installation (EPCI) contract for a tieback from Oselvar to the Ula platform in the North Sea. Aker Solutions estimates the contract value to be approximately NOK 450 million.

Recommend magazines

  Oilfield Technology