Skip to main content

AzarEnerji receives carbon credits for Hydro-3 project

 

Published by
Energy Global,

The Hydro-3 project, which includes the Mirik and Garagishlag small hydroelectric power plants located in the Lachin region of Azerbaijan, as part of the co-operation between SOCAR Trading and AzerEnergy OJSC, has entered the international carbon market.

The project was registered by Gold Standard, one of the world's leading carbon certification bodies, on 28 May 2025, and carbon credits for the Hydro-3 project were officially presented on 28 January 2026.

Thus, the Hydro-3 project is the first international carbon credits obtained for renewable energy sources in the history of Azerbaijan.

The carbon credits cover the period from April 2024 – August 2025 and total 10 745 carbon units. This indicator confirms that the project makes a real and measurable contribution to reducing greenhouse gas emissions.

 

 

For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.

Energy Global's Winter 2025 issue

Don’t miss out on our final issue of Energy Global this year! The Winter issue begins with a regional report on Africa’s energy future, with articles on topics such as wind turbine components, geothermal drilling & operations and energy storage technology. With contributors including Magnomatics, Flyability, Bachmann electronic GmbH, NOV, and more, don’t miss out!