Vestas has received a 125 MW order for a wind project in the US that will feature a mixed site configuration of various turbine variants of the 2 MW and 4 MW platforms, including a number of V150-4.2 MW turbines.
The order includes supply and commissioning of the turbines as well as a multi-year service agreement, designed to ensure optimised performance for the lifetime of the project. Turbine delivery is scheduled for 3Q2021, with commissioning scheduled for 4Q2021.
For more news and technical articles from the global renewable industry read our latest issue of Energy Global magazine.
Energy Global’s Winter 2020 issue
The Winter issue of Energy Global provides a range of technical articles covering technological advancements and future outlooks in the renewables sector, from companies including CorPower Ocean, Rystad Energy, Black & Veatch, Voltalia, FUERGY, and more.