GE connects all units at Jinzhai pumped storage hydro power plant in China
GE has connected all units of the Jinzhai pumped storage power plant to grid and completed 15 days of trial operation.
GE has connected all units of the Jinzhai pumped storage power plant to grid and completed 15 days of trial operation.
A 50 MW project located at Brook Farm, near Ipswich, and a 40 MW site in Stairfoot, Barnsley, UK, are now fully operational.