Skip to main content

The Nordex Group receives Voltalia Brasil order

Published by , Assistant Editor
Energy Global,


The Nordex Group has received another order for AW132/3465 turbines from Brazil. The manufacturer will supply 17 turbines for its regular customer Voltalia Brasil, for its 58.8 MW Ventos Serra do Mel 4 (VSM4) wind farm. The order also includes a service agreement for service and maintenance of the turbines for a period of 15 years.

In 2013, the Nordex Group delivered its first turbines to one of Voltalia’s Brazilian projects, and is now responsible for the Service and maintenance of around 400 MW for the company.

The wind farm VSM 4 will be built in Voltalia’s Serra Branca Cluster located in the state of Rio Grande do Norte, near to the city of Serra do Mel in the north-east of Brazil.

The Nordex Group will install the 17 turbines for VSM 4 on 120 m concrete towers produced by its local factory in Areia Branca, Rio Grande do Norte. In order to ensure the project includes a maximum local content, the Nordex Group will manufacture the nacelles in its plant in Simões Filho in Bahia as well as purchasing the rotor blades from Brazil.

Installation works on VSM 4 are due to start in 2020, with full commissioning scheduled for spring 2021.

Read the article online at: https://www.energyglobal.com/wind/04052020/the-nordex-group-receives-voltalia-brasil-order/

You might also like

 
 

Embed article link: (copy the HTML code below):