China to add 251 GW of new wind capacity by 2029
Wood Mackenzie expects China to add 251 GW of new wind capacity between 2020 and 2029.
Wood Mackenzie expects China to add 251 GW of new wind capacity between 2020 and 2029.
Vena Energy has chosen Vestas to service the 54 MW Gamesa turbines at the Pililla Wind Project in the Philippines.
Dogger Bank Wind Farm and Jan De Nul Group have signed the final contract for the transport and installation of offshore wind turbines at Dogger Bank A and B.