Skip to main content

Siemens Gamesa signs two new contracts for Spanish wind projects

Published by , Editorial Assistant
Energy Global,


Siemens Gamesa has signed two new contracts that will strengthen its leadership in Spain, where it currently has nearly 15 GW installed, 53% of the country's total capacity. Specifically, a contract with Grupo Jorge to supply seven SG 5.0-145 wind turbines for a wind farm in Herrera de los Navarros (Zaragoza) and another contract, with a different customer, to supply 10 turbines of the same model, also in the province of Zaragoza. The two contracts total 17 turbines and a capacity of 85 MW.

The Herrera de los Navarros wind farm is scheduled to come into operation in 2H2022 and the contract includes the maintenance of the turbines for a period of 15 years. The other wind farm will start operations in 1H2022 and includes maintenance of the wind turbines for 20 years.

The 17 nacelles that make up the two contracts will be assembled at Siemens Gamesa's plant in Ágreda (Soria), the gearboxes will be produced at the plants in Asteasu (Guipúzcoa), Lerma (Burgos) and the city of Burgos, and the electrical components will be produced at the factories in Reinosa (Cantabria), San Fernando de Henares (Madrid) and Benisanó (Valencia). Siemens Gamesa has nine plants in Spain employing 1200 people and more than 4500 employees in total in the country.

The sum of the two wind farms will provide the area with enough clean energy to power nearly 70 000 homes, one fifth of the province of Zaragoza, and will prevent the emission of 224 000 tpy of CO2, equivalent to the emissions of approximately 130 000 vehicles. To achieve these CO2 savings, it would be necessary to plant more than 3 million trees.

This new project will also boost the activity of Siemens Gamesa's Spanish suppliers, which will be involved in the production of various components. In 2020, the company’s purchases from Spanish companies amounted to €1253 million, 4% more than the previous year.

Spain, the second country in Europe and fifth in the world in terms of wind power installations, offers one of the highest rates of expected renewable energy growth. The goal set by the government for 2030 is to achieve 42% of final energy use from renewables, compared to 20% in 2020, with the stake of renewable energy in the electricity mix rising to 74%, and to 100% by 2050. New renewable energy auctions in Spain are among the measures planned to help meet this growth in renewables with an estimated allocation of 20 GW by 2025, half of which will be in wind energy.

 

 

For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.

Energy Global's Spring 2021 issue

The Spring issue of Energy Global features a varied spectrum of in-depth technical articles detailing recent projects, future projections, and technological advancements in the renewables sector, from companies including GlobalData, Atlas Copco, Watlow, QED Naval, TRACTO, AB Energy, and more.

Read the article online at: https://www.energyglobal.com/wind/25062021/siemens-gamesa-signs-two-new-contracts-for-spanish-wind-projects/

You might also like

 
 

Embed article link: (copy the HTML code below):