Arenko optimises second co-located battery with Vattenfall
Arenko has signed a second contract with Vattenfall to optimise a new co-located 20 MW/45.5 MWh battery asset in Northumberland, North East England.
Arenko has signed a second contract with Vattenfall to optimise a new co-located 20 MW/45.5 MWh battery asset in Northumberland, North East England.