Skip to main content

Other renewables - 27 July 2023

Elogen to supply a 2.5 MW electrolyser to Valmax

Elogen has announced the signature of a contract with Valmax Technology Corporation to design and manufacture a proton exchange membrane electrolyser with a power of 2.5 MW.

 

Taheke geothermal project referred for fast tracking

The Minister for the Environment has accepted Eastland Generation and Taheke 8C’s Taheke geothermal project’s resource consent application under the COVID-19 Recovery Fast Track Consenting provisions.