Roll Group and Hebetec Engineering AG release new offshore wind farm load-out solution
Published by Jessica Casey,
Editor
Energy Global,
Strategic partners, Roll Group and Hebetec Engineering AG, recently announced their shared patented solution for offshore wind farm load-outs during the SPE Offshore exhibition in Aberdeen.
This solution was developed to provide efficient and cost-effective solutions to logistical challenges of large and heavy offshore wind farm components. Roll Group and Hebetec Engineering AG have a strategic corporation agreement which focuses on the global demand for renewable and civil construction solutions.
FoWeLo, as the solution is called, uses innovative equipment and technology to tackle a very real and current challenge: the high costs and high dependency for loading out offshore floating wind foundations.
The patented FoWeLo system was developed to solve two critical industry chal-lenges: the high cost and port logistics constraints of launching floating offshore wind foundations. The system offers a robust design using existing hydraulic equipment and temporary steel structures. It is designed to be fully containerised, with no restrictions due to tidal effects, which simplifies mobilisation and ensures low carbon dioxide emissions by using seawater as a counterweight.
“We definitely believe that the FoWeLo system is an innovative solution for an industry that faces high transportation costs. As floating offshore foundations are the only option for offshore wind in many countries, we have a role to play and aim to develop innovative technical solutions. The FoWeLo system is a price competitive option and will increase the load out speed of the foundations,” said Steven Dunnewijk, CEO Hebetec Engineering AG.
Roll Group CEO, Peter Rondhuis, added: We are delighted that we have designed the FoWeLo system in cooperation with our partner Hebetec Engineering AG. Within this strategic alliance, we have complementary skills and competences that lead to a great synergy between both companies. The FoWeLo solution uses existing gantry, mooring and ballasting equipment from Roll Group, whereas the strandjacks and APS skidding equipment are provided by Hebetec Engineering AG. This – together with our combined engineering skills and market know how – makes us the perfect partners for this invention.”
For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.
Energy Global's Summer 2023 issue
The Summer 2023 issue of Energy Global hosts an array of technical articles focusing on alternative fuels, battery storage solutions, solar optimisation, and more. This issue also features a regional report on the recent developments in the European renewables market.
Read the article online at: https://www.energyglobal.com/product-news/12092023/roll-group-and-hebetec-engineering-ag-release-new-offshore-wind-farm-load-out-solution/
You might also like
ILI Group secures consent for 100 MW battery storage project in North Ayrshire
ILI Group has announced that Section 36 planning consent has been granted for its 100 MW Flemyland battery energy storage system project in North Ayrshire by Scottish Ministers.