Skip to main content

Voltalia’s Karavasta solar farm powers up in Albania

Published by , Editorial Assistant
Energy Global,


Voltalia, an international player in renewable energies, announces the start of production of its 140 MW solar project, located in the Fier district of southern Albania.

Voltalia’s Karavasta solar farm powers up in Albania

With a total capacity of 140 MW, the Karavasta power station can generate electricity equivalent to the consumption of 220 000 people.

All of the plant's capacity is secured by long-term electricity sales contracts with public and private players.

“I would like to express my gratitude to all those involved in making this project a reality, in particular the Albanian Council of Ministers, the Ministry of Infrastructure and Energy, the banking consortium under the lead of European Bank for Reconstruction and Development (EBRD) and the Voltalia teams,” said Sébastien Clerc, CEO of Voltalia.

 

For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.

Energy Global's Winter 2023 issue

The Winter 2023 issue of Energy Global hosts an array of technical articles weather analysis, geothermal solutions, energy storage technology, and more. This issue also features a regional report looking at the future of renewables in North America, and a report from Théodore Reed-Martin, Editorial Assistant, Energy Global, on how Iceland utilises its unique geology for renewable energy.

Read the article online at: https://www.energyglobal.com/solar/28122023/voltalias-karavasta-solar-farm-powers-up-in-albania/?yptr=yahoo

You might also like

Hy2gen and Ocean Connect Energy sign MoU

Hy2gen has signed a memorandum of understanding with Ocean Connect Energy Inc. for the mutual investigation of the potential to power renewable hydrogen production from offshore wind.

 
 

Embed article link: (copy the HTML code below):