Skip to main content

Vestas receives 84 MW American repowering order

Published by , Editorial Assistant
Energy Global,


Vestas has received an 84 MW order to repower an undisclosed wind project in the USA. The repower order consists of 38 V110-2.2 MW turbines.

The orders include supply, delivery, and commissioning of the turbines, as well as a multi-year Active Output Management 5000 (AOM 5000) service agreement, designed to ensure optimised performance of the asset.

Turbine delivery begins in 3Q25 with commissioning scheduled for 4Q25.

 

 

For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.

Energy Global's Summer 2024 issue

The Summer 2024 issue of Energy Global starts with a guest comment from Terrawatt on the streamlining of the permitting process in Italy, before moving on to a regional report from Frost & Sullivan on the energy landscape in Asia Pacific. This issue looks at key topics such as wind installation vessels, offshore wind turbine foundations, weather analysis, solar maintenance, and more!

Read the article online at: https://www.energyglobal.com/wind/04072024/vestas-receives-84-mw-american-repowering-order/

You might also like

 
 

Embed article link: (copy the HTML code below):