Skip to main content

Siemens Gamesa awarded repowering by MidAmerican Energy

Published by , Digital Editorial Assistant
Energy Global,


Siemens Gamesa has been selected by MidAmerican Energy Company for the Rolling Hills wind power project for a total of 429.3 MW, the largest repowering order to date in North America. The company will repower the project with 163 SG 2.7-129 and 18 previously sold SWT-2.3-108 wind turbines.

Rolling Hills is located in Adair, Adams and Cass counties in Iowa and currently features 193 SWT-2.3-101 turbines. The repowering project includes replacement of the blades, hubs and nacelles for all units, and top tower sections for the SG 2.7-129 units. Commissioning of the project is expected for late 2021.

The SG 2.7-129 turbine builds on the robust and successful 2.3 MW geared product series.

Read the article online at: https://www.energyglobal.com/wind/08072019/siemens-gamesa-awarded-the-largest-repowering-order-to-date-in-north-america-by-midamerican-energy/

You might also like

 
 

Embed article link: (copy the HTML code below):