Cadeler strengthens future installation capacity with firm orders for two T-class vessels
Published by Abby Butler,
Editorial Assistant
Energy Global,
Cadeler has signed firm contracts with COSCO Shipping Offshore shipyard in Qidong, China, for the construction of two new T-class offshore wind installation vessels, scheduled for delivery in 2030 and 2031.
Earlier in 2026, Cadeler secured the equity financing for this investment as part of its long-term strategy to become the preferred offshore wind installation partner and to support the continued growth of the offshore wind industry. The new T-class series vessels have been engineered to be the largest and most capable vessels ever introduced to this market, incorporating breakthrough technologies and operational capabilities that extend well beyond current industry standards. Designed to tackle increasingly complex projects with greater efficiency, versatility, and performance, they are expected to open access to new opportunities while reinforcing Cadeler’s long-term competitive advantage and commitment to innovation.
The contracts build on Cadeler’s established collaboration with COSCO Shipping Offshore shipyard, which has already constructed several vessels as part of Cadeler’s newbuild programme. The agreement was secured on competitive commercial terms and reinforces the strong relationship between the two companies. The contract price for the two T-class vessels is approximately €805 million in aggregate.
Mikkel Gleerup, CEO of Cadeler, commented: “As offshore wind projects become larger and more technically demanding, developers need installation partners with the experience, specialised capabilities, and modern fleet to deliver them safely and reliably. Our investment in the T-class reflects our commitment to staying ahead of future customer requirements, delivering best-in-class technical solutions and raising the bar for excellence in offshore wind installation. We are pleased to continue our collaboration with COSCO Shipping Offshore shipyard, with whom we have built a strong and trusted working relationship over several years. Their understanding of our requirements and commitment to quality have made them a valued partner as we continue expanding our fleet.”
The T-class vessels form part of Cadeler’s long-term fleet expansion strategy and reflect Cadeler’s continued investment in the capabilities required to support the accelerating build-out of offshore wind across key markets. Cadeler is already in discussions with key clients for the deployment of the T-class vessels.
For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.
Energy Global’s Summer 2026 issue
The Summer issue of 2026 is out now! The new issue starts with a regional report on Latin America and the Caribbean, considering the benefits and challenges of renewable energy development in the region. The issue also covers topics such as lubricants, digitalisation, the importance of ports, battery storage technology, and more! With contributors from industry leaders including ABB, WindEurope, Sungrow, among others, this is an issue not to miss.
Read the article online at: https://www.energyglobal.com/wind/10082026/cadeler-strengthens-future-installation-capacity-with-firm-orders-for-two-t-class-vessels/
You might also like
Fred. Olsen Renewables submits wind farm proposal
Fred. Olsen Renewables has submitted a Section 36 application to Scottish Ministers for a 20-turbine wind farm proposal at Invercassley in Scotland.