New Antwerp Port hub strengthens deugro’s wind energy logistics network
Published by Abby Butler,
Editorial Assistant
Energy Global,
To address rapidly increasing demand for port handling and storage capacity amid limited market availability, deugro has commissioned a new port setup in Antwerp, Belgium, designed to handle and store the full range of wind turbine generator (WTG) components.
The port setup offers storage and handling space for the full range of WTG components, from rotor blades and nacelles to tower sections, as well as specialised equipment for handling and managing complex breakbulk cargoes.
In addition to its facilities in Lindø within the Port of Odense, Denmark, the Port of Wilhelmshaven, and the Port of Brake, Germany, the Antwerp setup marks the fourth facility deugro has established within a short period to provide its clients in the global wind and renewable energy industry with dedicated port handling and storage capacity for WTG components.
The new Antwerp setup is supported by high-capacity cranes, specialised handling equipment, and extensive storage and pre-assembly areas. In addition, the port’s strategic location provides flexible onward transportation options through direct access to European road, rail, and inland waterway networks.
Wouter Gielen, Branch Manager, deugro Antwerp, Belgium, noted: “With direct access to Europe’s road, rail, and inland waterway networks, the Antwerp setup offers flexible connectivity to project sites across Belgium, Germany, the Netherlands, and beyond. Its location along the Rhine-Scheldt corridor further enables the use of inland barges as a sustainable transport alternative for oversized and heavy WTG components. Combined with strong multimodal hinterland connections and close proximity to key project sites, Antwerp serves as a strategic hub for the distribution of wind energy components throughout Europe.”
Together with its local partners, deugro offers the full range of services, equipment, and expertise required for the handling, storage, and consolidation of WTG components, while providing maximum flexibility for subsequent road and inland waterway transportation. The company’s port handling services include port agency co-ordination, vessel discharge operations and supervision, terminal operations co-ordination, and heavy-lift cargo handling. Warehouse and storage services comprise dedicated storage management, blade and component storage planning, inventory control, condition inspections and documentation, as well as site surveys. In addition, deugro provides preparation and project logistics management for onward transportation, ensuring seamless co-ordination throughout the entire supply chain.
Maximilian Granzow, Sales and Business Development Manager – Wind Onshore Germany at deugro, commented: “By utilising Antwerp as a strategic hub, our client benefits from scalable storage capacity, optimised supply chain management, and enhanced responsiveness for upcoming project deliveries. Since commencing operations, the setup has already demonstrated its capabilities. In July 2026, we successfully completed the discharge of the first vessels and the subsequent cargo handling and storage at the terminal facility.”
Peter Ehrhorn, Director Onshore Wind & Cables at deugro, concluded: “The Antwerp setup represents another important step in the continued expansion of deugro’s dedicated global wind and renewable energy infrastructure network. As turbine dimensions increase and project schedules become more demanding, strategically located logistics hubs are becoming essential to ensuring supply chain reliability, scalability, and execution certainty for our clients. Antwerp further strengthens our ability to support the continued growth of wind energy projects across Europe with dedicated infrastructure and integrated logistics solutions.”
For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.
Energy Global’s Autumn 2026 issue
The Autumn issue of 2026 is available now! The new issue begins with a regional report on Asia Pacific, looking at the region’s transition from building capacity to building systems. The issue also explores topics such as offshore wind foundations, solar maintenance, training the new workforce, inspection & maintenance, and more! With insights from experts such as Everllence, BW Ideol, EM&I, Watson Farley & Williams, and many more, make sure to check out this issue now.
Read the article online at: https://www.energyglobal.com/wind/22092026/new-antwerp-port-hub-strengthens-deugros-wind-energy-logistics-network/