Port of Roenne selected as installation port for Baltic Eagle project
50 turbines will be pre-assembled and installed out of Port of Roenne A/S for the Baltic Eagle offshore wind farm.
50 turbines will be pre-assembled and installed out of Port of Roenne A/S for the Baltic Eagle offshore wind farm.
NOV will design and equip two new X-Class jack-up vessels for Cadeler.