Wärtsilä solutions selected for OHT’s wind turbine installation vessel
Published by Bella Weetch,
Editorial Assistant
Energy Global,
The technology group Wärtsilä has been selected to supply an integrated propulsion and dynamic positioning thruster solution, including the engines, a Wärtsilä NOx reducer emission abatement system, as well as steerable and tunnel thrusters to deliver optimum performance for vessel dynamic positioning in this new wind turbine installation vessel (WTIV). The ship is being built at the China Merchants Heavy Industry (Jiangsu) Co yard for Norwegian heavy transport and WTG installation contractor OHT ASA, and is the first of two next-generation WTIVs to be added to the OHT fleet. The order with Wärtsilä was placed in May 2021.
The GustoMSC NG-14000XL-G design jack-up vessel is customised for offshore wind turbine installation and XL monopile foundations. The vessel will feature a telescopic crane with a maximum capacity of 2500 t and a maximum lifting height of approximately 165 m. The compact design of the Wärtsilä thrusters is an important benefit since the weight of all onboard equipment can be critical for a jack-up vessel. The lightweight Wärtsilä thruster package meets this requirement while delivering excellent station-keeping capability.
“There is rapid growth in demand for the installation of offshore wind turbines, and the vessels designed to carry out this construction work need to be state-of-the-art. The same applies to the propulsion solutions because reliable and efficient dynamic positioning is essential in all sea conditions. The full scope of Wärtsilä solutions will provide the operational and environmental performance demanded for the next-generation market,” says Torben Mikkelsen, OHT’s Newbuild Project Manager.
“The aim is always to provide optimal propulsion performance for efficient vessel operations, and the advanced range of Wärtsilä solutions selected for this ship will do just that. By enabling efficient free sailing and outstanding dynamic positioning, we are at the same time contributing to the decarbonisation of shipping,” says Dirk Folchert, Senior Sales Manager, Wärtsilä Marine Power.
The Wärtsilä scope includes four Wärtsilä 32 and two Wärtsilä 20 engines, the Wärtsilä NOx reducer (NOR) system, five steerable thrusters and one Wärtsilä tunnel thruster. Delivery to the yard will take place during 1H2022. The ship is expected to be delivered during 2Q2023.
Effective station-keeping is enhanced by the thrusters’ proven retractable system, which has an energy efficient 8-degree tilting feature. This reduces the power need and, therefore, also fuel consumption. The thrusters also deliver thrust that can be up to 23% more effective than non-tilted units. The Wärtsilä steerable thrusters feature a modern electric steering system to provide higher redundancy, reliability, and a lower lifecycle cost.
For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.
Energy Global's Summer 2021 issue
The Summer issue of Energy Global features a varied spectrum of in-depth technical articles detailing recent projects, future projections, and technological advancements in the renewables sector, from companies including CEWEP, Enel Green Power, Turboden S.p.A., Cornwall Insight, and more.
Don’t forget to sign up to receive future digital issues of Energy Global for free here.
Read the article online at: https://www.energyglobal.com/wind/29072021/wrtsil-solutions-selected-for-ohts-wind-turbine-installation-vessel/
You might also like
Ireland starts national offshore renewable study
The Minister for Climate, Environment and Energy, Darragh O’Brien, has announced the commencement of work on the preparation of a National Offshore Renewable Energy Designated Maritime Area Plan.