Skip to main content

Ibri 2 solar PV panels are shipped

Published by , Assistant Editor
Energy Global,


A consortium consisting of ACWA Power, Gulf Investment Corporation (GIC) and Alternative Energy Projects Co. (AEPC) has achieved a new milestone for the 500 MW Ibri 2 solar PV project, which entails the shipment of the first 10 MWp of 24 700 bifacial solar panels manufactured by Jolywood. The panels will generate an output capacity of 405 Wp per panel.

Located in Al-Dhahirah Governorate, Ibri 2 PV IPP will contain approximately 1.4 million solar panels and extend over an area of 13 million square m. The 500 MW project is deemed to be Oman’s largest utility-scale solar PV Independent Power Project. At peak generation capacity, the plant output will be enough to supply an estimated 33 000 homes with electricity and will offset 340 000 tpy of CO2 emissions.

Read the article online at: https://www.energyglobal.com/solar/03072020/ibri-2-solar-pv-panels-are-shipped/

You might also like

 
 

Embed article link: (copy the HTML code below):