Skip to main content

First Solar acquires new distribution centre in Ohio

Published by , Editorial Assistant
Energy Global,


First Solar, Inc. has announced that it has acquired a 1.2 million ft2 facility in Troy Township, Ohio. The facility, formerly known as Peloton Output Park, is expected to be repurposed into a new distribution centre serving First Solar’s Ohio manufacturing footprint, which comprises three manufacturing facilities with a combined annual nameplate capacity of approximately 6 GW of capacity at the end of 2023.

First Solar acquires new distribution centre in Ohio

First Solar, Inc. has announced that it has acquired a 1.2 million ft2 facility in Troy Township, Ohio. The facility, formerly known as Peloton Output Park, is expected to be repurposed into a new distribution centre serving First Solar’s Ohio manufacturing footprint, which comprises three manufacturing facilities with a combined annual nameplate capacity of approximately 6 GW of capacity at the end of 2023.

“As we prepare to expand our Ohio capacity by almost a gigawatt this year, there’s a need for our logistics and distribution capabilities to scale to match manufacturing growth,” said Mike Koralewski, Chief Supply Chain Officer of First Solar. “We intend to use this facility to ensure the efficient and timely shipping of modules to our customers, repurposing it into a dedicated distribution hub for the largest solar manufacturing footprint in the Western Hemisphere. We expect that this approach will allow us to streamline logistics operations, while reducing operating costs and contributing to our cost reduction roadmap. In the long term, the flexible space that the facility affords us could also serve as a light-scale satellite manufacturing location with the potential to support our factories and R&D centre in Ohio.”

In addition to expanding its Ohio footprint to over 7 GW of annual nameplate capacity this year, the solar technology and manufacturing company expects to invest over US$2 billion in new manufacturing facilities in Alabama and Louisiana. First Solar expects to have 14 gigawatts of fully vertically integrated US solar manufacturing capacity by 2026. Additionally, First Solar is investing up to US$370 million in a dedicated R&D innovation centre in Perrysburg, Ohio, which is expected to be completed in 2024.

 

 

For more news and technical articles from the global renewable industry, read the latest issue of Energy Global magazine.

Energy Global's Winter 2023 issue

The Winter 2023 issue of Energy Global hosts an array of technical articles weather analysis, geothermal solutions, energy storage technology, and more. This issue also features a regional report looking at the future of renewables in North America, and a report from Théodore Reed-Martin, Editorial Assistant, Energy Global, on how Iceland utilises its unique geology for renewable energy.

Read the article online at: https://www.energyglobal.com/solar/22012024/first-solar-acquires-new-ohio-distribution-centre/

You might also like

 
 

Embed article link: (copy the HTML code below):