Nordex Group obtains order for more than 200 MW in Canada
The Nordex Group will supply 36 N155/5.X turbines for a wind farm, which is expected to reach full commercial operation in 2024.
The Nordex Group will supply 36 N155/5.X turbines for a wind farm, which is expected to reach full commercial operation in 2024.
The three wind turbines, each with a capacity of 3.9 MW, are located approximately 50 km south of Hamburg, Germany, producing enough energy to power 7500 households each year.