Correll Group secures further contract from Seaway 7
The Correll Group has been contracted by Seaway 7 to complete the termination and testing of 29 66kV inter-array cables and four landfall export cables on Zhong Neng offshore wind farm.
The Correll Group has been contracted by Seaway 7 to complete the termination and testing of 29 66kV inter-array cables and four landfall export cables on Zhong Neng offshore wind farm.
Star of the South has confirmed that both the Port of Hastings and a Gippsland port will play important roles in the proposed offshore wind farm’s construction and operation, with an estimated 200 long-term jobs to be created in Gippsland.
SSE Renewables has celebrated the successful installation of the final turbine at the 443 MW Viking wind farm in Shetland, the UK.