GMB Works to reduce offshore wind turbine noise pollution
The company’s new piledriving method should limit the noise pollution caused by driving foundation piles into the seabed by 90 - 95%.
The company’s new piledriving method should limit the noise pollution caused by driving foundation piles into the seabed by 90 - 95%.
Taiwan Power Company appoints DNV as Owner’s Engineer for the 300 MW Changhua II offshore wind farm.
The company has been awarded a contract by VNECO to supply eight of its wind turbines for the Thuan Nhien Phong wind farm in the Binh Thuan province, Vietnam.