First offshore wind nacelles installed at Baltic Power offshore wind farm
The first offshore wind nacelles, manufactured in Poland, have been installed at the Baltic Power offshore wind farm.
The first offshore wind nacelles, manufactured in Poland, have been installed at the Baltic Power offshore wind farm.
Nexans has marked a major milestone with the hull launch of a new cable laying vessel from the dock hall at Ulstein Verft, Norway.