
Omexom receives confirmation of compliance to BSH requirements on drone inspection of rotor blades
Following Omexom’s compliance of their methodology to the BSH, the company can now provide recurrent inspections of rotor blades via drones.
Stay up to date with the latest news and updates from the renewable industry.

Following Omexom’s compliance of their methodology to the BSH, the company can now provide recurrent inspections of rotor blades via drones.

Vattenfall has acquired the German solar developer, Solizer.

Breesea Limited, Soundmark Wind Limited, and Sonningmay Wind Limited, a joint venture owned by Ørsted (50%) and AXA IM Alts and Crédit Agricole Assurances (jointly 50%), have signed an agreement on the sale of their transmission assets to Diamond Transmission Partners Hornsea Two Limited.

Carlton Power has received planning consent to build a £750 million 1GW battery project at the company’s Trafford Low Carbon Energy Park in Greater Manchester.

TotalEnergies has signed an agreement with Rönesans Holding to acquire a 50% stake in Rönesans Enerji and jointly develop renewable projects in Türkiye.

Equinor has signed an agreement with Denham Capital to acquire Rio Energy, an onshore renewables company in Brazil.

Scientists at the U.S. Department of Energy’s Argonne National Laboratory have carried out a study to determine the potential of pumped storage hydropower as an efficient way to store large amounts of energy and improve grid resiliency throughout Alaska.

In the first five months of 2023, InterMoor APAC, a brand in Acteon’s Engineering, Mooring, and Foundations Division, has been awarded eight floating wind studies by various operators in East Asia.

GreenFire Energy Inc. and PT Medco Power Indonesia have signed a memorandum of understanding to cooperate on future Indonesian geothermal projects.

VSB Poland has announced that it has started the building of the Racibórz wind farm.

Jones Bros Civil Engineering UK has completed the installation of approximately four miles of high voltage alternating current cable from the converter station to the Creyke Beck electricity substation for the first phase of Dogger Bank wind farm.

Exergy International srl and Geothermal Engineering Ltd signed a contract for the supply of a 3 MWe gross capacity ORC power plant at the United Downs site, in Cornwall.